International MWM Cases
MWM has rolled out projects of all sizes around the globe, installing small biogas gensets as well as power plants with an output of more than 50 MWel.

Bioenergie Oberspiesheim, Germany
The new cogeneration power plant working of the biogas plant in Oberspiesheim in the Nuremberg metropolitan area is equipped with an MWM TCG 2020 V12 gas engine and is working in flexible operation.

Energieversorgung Nordhausen GmbH, Germany
Modernization to Ensure Stability of Supply: Engine replacement with four modern MWM gas engines with a total output of 8,000 kW.

Stadtwerke München Services GmbH, Germany
The Munich City Utilities (Stadtwerke München Services GmbH) opted for the MWM TCG 2020 V16 genset, a gas engine type that delivers more efficiency, reduced emissions, improved profitability, and longer maintenance intervals.

Torres de Segre, Spain
The plant located in Torres de Segre consists of two TCG 2020 V12 containerized gensets producing electricity using biogas and natural gas.

Landfill Suzhou, China
The landfill gas plant consists of 3 containerized TCG 2020 V16. Its current is fed into the local power grid.

Bioenergie Hack Verwaltungsgesellschaft mbH, Wentorf
The biogas plant runs on a 50/50 mix of cattle manure from the farm’s dairy cows and corn grown on the fields. In addition to the TCG 3016, a smaller MWM genset with an output of 400 kWel is installed.

BIOgasfarm GmbH Projekt Löberitz, Germany
The biogas plant has an electrical output of 600 kW and is operated using farm slurry, farmyard manure and plant-derived biomass material in the form of maize silage.

“Der Grashof” nursery – KBB Biogas GmbH & Co. KG, Kirchlinteln, Germany
The plant has a thermal output of 3.5 million kWh per year, so it covers more than 40 % of our heating needs. The MWM TCG 2016 V12 C gas engine is unbeatable when it comes to system and operating efficiency.

Biogas Park Altmark, Danpower Energy Service GmbH, Potsdam, Germany
Per year and plant, some 10,000 t of energy crops are used in the Biogas Park Altmark. These are supplied by farms from the region.

GaoAnTun Landfill, Beijing, China
The project at the GaoAnTun landfill started in 2007 with the installation of one TCG 2016 V12B unit with an output of 537 kWel.
MWM Sales Solutions
MWM Solutions Provider
The MWM Solutions Providers design and plan power plant projects in certain regions and are specialized in the scheduled and ad-hoc maintenance of power plants with MWM gas gensets.






































