{"id":91569,"date":"2021-09-03T20:15:25","date_gmt":"2021-09-03T18:15:25","guid":{"rendered":"https:\/\/www.mwm.net\/?page_id=91569"},"modified":"2021-09-03T20:20:13","modified_gmt":"2021-09-03T18:20:13","slug":"fit-for-the-future","status":"publish","type":"page","link":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/","title":{"rendered":"Fit for the future"},"content":{"rendered":"<h2>Investments in speed, precision and production technology make MWM connecting rod machining fit for the future<\/h2>\n<p>Since the end of 2013, the connecting rod production hall has undergone a number of changes at the Mannheim plant. Substantial construction projects made room for two new connecting rod machine tools. In fact, the entire production hall configuration had to be adapted to the connecting rod machining centers.  MWM Project Coordinator Karl-Heinz Frank (Industrial Engineering) explains the advantages and changes implemented through this investment.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8275_2_NL05_pleuelbearbeitung_1.jpg\" alt=\"Connecting rod machining for MWM gas engines with utmost precision\" \/><br \/>\n<em>Connecting rod machining for MWM gas engines with utmost precision<\/em><\/p>\n<p><strong>MWM Newsflash:<\/strong> Mr. Frank, what was the reason for acquiring the new connecting rod machine tools?  <\/p>\n<p><strong>Karl-Heinz Frank:<\/strong> In the past few years, the demand for connecting rods, from both a production and service standpoint, has been growing continually. Today we require roughly one hour to machine a connecting rod. With the help of the new machines, there are plans to produce up to 30% more connecting rods per day and thus meet production and service demands. This pertains to the TCG 2020 engine series, for which the connecting rod machine tools were purchased.   <\/p>\n<p><strong>MWM Newsflash:<\/strong> How will the machines be integrated into the existing machining process? <\/p>\n<p><strong>Karl-Heinz Frank:<\/strong> Currently the machines are still in the final phase of trial operations; after all they were only just run in at the end of the year. In December our employees received training and orientation on the new machines. Prior to setting up the machines, we had to do some rearranging in the production hall in order to adapt the hall configuration to the new machining centers. Previously the connecting rods were machined upright, whereas on the new machines, the connecting rods are finished horizontally. By doing so, we intend to boost speed and precision and improve upon the manufacturing technology. <\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8394_2_MWM_NL05_pleuel.jpg\" alt=\"Connecting rod for MWM Gas engines\" \/><br \/>\n<em>Connecting rod for MWM Gas engines<\/em><\/p>\n<p><strong>MWM Newsflash:<\/strong> What advantages does the new production layout offer employees?  <\/p>\n<p><strong>Karl-Heinz Frank:<\/strong>  It represents an improvement in the production line configuration, which means better ergonomics and design at each workstation. As a result, the measuring equipment and deburring instruments will now be located directly at the workstation, which facilitates handling and provides for fatigue-free work.<\/p>\n<p>Each machine has seven machining stations, one of which is used for loading and unloading. The connecting rods are machined in the following work steps: <\/p>\n<ul>\n<li>The tensioning system (clamping the connecting rod for machining) works fully automatically<\/li>\n<li>Pre-machining of the blank<\/li>\n<li>Separation of the connecting rod<\/li>\n<li>Boring of the threads<\/li>\n<li>Boring of the serration<\/li>\n<li>Surface treatment<\/li>\n<li>Measurements are made between the steps to ensure that parameters have been met <\/li>\n<\/ul>\n<p>We were able to reduce the machine time per connecting rod by approximately 10%. Through the use of optimized software, we want to increase process reliability and reach our quality objectives. <\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8476_2_MWM_NL05_pleuelbearbeitung_team.jpg\" alt=\"Karl-Heinz Frank with his team\" \/><br \/>\n<em>Karl-Heinz Frank with his team<\/em><\/p>\n<p><strong>MWM Newsflash:<\/strong> Is the modernization of the connecting rod production line now complete?  <\/p>\n<p><strong>Karl-Heinz Frank:<\/strong> Not quite. An additional Elb grinding machine was also purchased for about 800,000 euros. It is used to grind the serration into the parting lines of the connecting rod. Thanks to the second Elb grinding machine, we avoid machining bottlenecks and minimize the risk of downtimes. In the first half of 2014, another machine will be purchased for crank case production. It will be used for machining crank cases of the models TCG 2016 to 2020 V12. In order to reduce transport in production, the machine will come equipped with a so-called &#8220;Fastems system&#8221;. This means that the blanks are stored in a high rack from where the machine is loaded automatically.  With these new machines, we have made ourselves fit for the future!  <\/p>\n<p><strong>MWM Newsflash:<\/strong> Thank you, Mr. Frank, for your time. <\/p>\n<p><img decoding=\"async\" class=\"alignnone\" src=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8701_2_MWM_NL05_Karl-Heinz_Frank.jpg\" alt=\"Project coordinator Karl-Heinz Frank\" width=\"500\" height=\"534\" \/><br \/>\n<em>Project coordinator Karl-Heinz Frank<\/em><\/p>\n<p><strong>Name:<\/strong> Karl-Heinz Frank<\/p>\n<p><strong>Position:<\/strong> Projektkoordinator Industrial Engineering<\/p>\n<p><strong>Bei MWM seit:<\/strong> 1977<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Over the last two years, Caterpillar has expanded the Mannheim location to become a global Gas Center of Excellence. The long-term investment towards strengthening the location is also reflected in the modernization of machinery and facilities. One of the most recent investment projects encompasses the procurement of two new connecting rod machining tools for about 2.3 million euros. MWM Newsflash interviews Karl-Heinz Frank, Project Coordinator Industrial Engineering, on this topic.<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":91545,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-sidebar-template.php","meta":{"_acf_changed":false,"footnotes":""},"tags":[],"class_list":["post-91569","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.9 (Yoast SEO v27.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Fit for the future<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Fit for the future\" \/>\n<meta property=\"og:description\" content=\"Over the last two years, Caterpillar has expanded the Mannheim location to become a global Gas Center of Excellence. The long-term investment towards strengthening the location is also reflected in the modernization of machinery and facilities. One of the most recent investment projects encompasses the procurement of two new connecting rod machining tools for about 2.3 million euros. MWM Newsflash interviews Karl-Heinz Frank, Project Coordinator Industrial Engineering, on this topic.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/\" \/>\n<meta property=\"og:site_name\" content=\"MWM\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-03T18:20:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8275_2_NL05_pleuelbearbeitung_1.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/fit-for-the-future\\\/\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/fit-for-the-future\\\/\",\"name\":\"Fit for the future\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/fit-for-the-future\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/fit-for-the-future\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mwm.net\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/8275_2_NL05_pleuelbearbeitung_1.jpg\",\"datePublished\":\"2021-09-03T18:15:25+00:00\",\"dateModified\":\"2021-09-03T18:20:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/fit-for-the-future\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/fit-for-the-future\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/fit-for-the-future\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/8275_2_NL05_pleuelbearbeitung_1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.mwm.net\\\/wp-content\\\/uploads\\\/2021\\\/09\\\/8275_2_NL05_pleuelbearbeitung_1.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/fit-for-the-future\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Newsflash MWM Internal\",\"item\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/?page_id=1079\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Newsflash 05 &#8211; February 2014\",\"item\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/newsletter-mwm-internal\\\/newsflash-05-february-2014\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Fit for the future\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/\",\"name\":\"MWM\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#organization\",\"name\":\"Caterpillar Energy Solutions GmbH\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/logo2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.mwm.net\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/logo2.jpg\",\"width\":260,\"height\":142,\"caption\":\"Caterpillar Energy Solutions GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Fit for the future","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/","og_locale":"en_US","og_type":"article","og_title":"Fit for the future","og_description":"Over the last two years, Caterpillar has expanded the Mannheim location to become a global Gas Center of Excellence. The long-term investment towards strengthening the location is also reflected in the modernization of machinery and facilities. One of the most recent investment projects encompasses the procurement of two new connecting rod machining tools for about 2.3 million euros. MWM Newsflash interviews Karl-Heinz Frank, Project Coordinator Industrial Engineering, on this topic.","og_url":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/","og_site_name":"MWM","article_modified_time":"2021-09-03T18:20:13+00:00","og_image":[{"url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8275_2_NL05_pleuelbearbeitung_1.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/","url":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/","name":"Fit for the future","isPartOf":{"@id":"https:\/\/www.mwm.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/#primaryimage"},"image":{"@id":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8275_2_NL05_pleuelbearbeitung_1.jpg","datePublished":"2021-09-03T18:15:25+00:00","dateModified":"2021-09-03T18:20:13+00:00","breadcrumb":{"@id":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/#primaryimage","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8275_2_NL05_pleuelbearbeitung_1.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/09\/8275_2_NL05_pleuelbearbeitung_1.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/fit-for-the-future\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mwm.net\/en\/"},{"@type":"ListItem","position":2,"name":"Newsflash MWM Internal","item":"https:\/\/www.mwm.net\/en\/?page_id=1079"},{"@type":"ListItem","position":3,"name":"Newsflash 05 &#8211; February 2014","item":"https:\/\/www.mwm.net\/en\/newsletter-mwm-internal\/newsflash-05-february-2014\/"},{"@type":"ListItem","position":4,"name":"Fit for the future"}]},{"@type":"WebSite","@id":"https:\/\/www.mwm.net\/en\/#website","url":"https:\/\/www.mwm.net\/en\/","name":"MWM","description":"","publisher":{"@id":"https:\/\/www.mwm.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mwm.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mwm.net\/en\/#organization","name":"Caterpillar Energy Solutions GmbH","url":"https:\/\/www.mwm.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","width":260,"height":142,"caption":"Caterpillar Energy Solutions GmbH"},"image":{"@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/pages\/91569","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/comments?post=91569"}],"version-history":[{"count":3,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/pages\/91569\/revisions"}],"predecessor-version":[{"id":91572,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/pages\/91569\/revisions\/91572"}],"up":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/pages\/91545"}],"wp:attachment":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/media?parent=91569"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/tags?post=91569"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}