{"id":63415,"date":"2018-11-22T00:00:00","date_gmt":"2018-11-21T22:00:00","guid":{"rendered":"http:\/\/wordpress.home\/?page_id=63415"},"modified":"2021-06-17T12:16:37","modified_gmt":"2021-06-17T10:16:37","slug":"modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines","status":"publish","type":"post","link":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/","title":{"rendered":"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market"},"content":{"rendered":"\r\n<p><b>Mannheim, November 22, 2018<\/b><\/p>\r\n<p>After 80,000 hours of operation and some wear and tear, the <a href=\"https:\/\/www.mwm.net\/en\/distributed-power-plants\/\">CHP (combined heat and power) plant <\/a>of the W\u00fcrzburg energy supplier was modernized and upgraded for the entry to the control energy market. In 1995, two TGB 620 V16 engines with a total output of approximately 2 MW and an electrical efficiency of about 36 percent had been installed for the Heuchelhof site. The plant generates about 9 million kW of thermal energy and 6 million kW of electrical energy, most of which is used for the heat supply. In total, the two newly installed <a href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/gas-engine-tcg-2020\/\">MWM TCG 2020 V12 gensets<\/a> have more or less the same nominal output as their predecessors. However, especially the electrical efficiency has gone up substantially, enabling an overall efficiency of more than 93 percent. For the W\u00fcrzburg municipal utility provider, the investment of approximately \u20ac2 million will render the operation more efficient on a long-term basis.<\/p>\r\n<p>In view of the heat utilization of mixture cooling level II for a coolant inflow at up to 70\u00b0C, which is possible with this genset type, ETW considers the MWM TCG 2020 V12 (1.0) to be the most attractive solution under consideration of the framework conditions of available CHP applications.<\/p>\r\n<img decoding=\"async\" src=\"https:\/\/www.mwm.net\/files\/upload\/image\/7363_2_MWM-TCG-2020-V12.jpg\" alt=\"\" title=\"MWM Gas Engine TCG 2020 V12\">\r\n\r\n<h2>Reduced Carbon Emissions and Steady Power Supply through Flex Operation<\/h2>\r\n<p>The replacement of the natural gas-fired engines with the new models saves resources and makes the location more efficient. The renewed CHP plant will enable carbon savings of up to 5,703 t\/year and supply about 3,000 homes with electricity. Due to the reduced use of natural gas resources, the plant will also be covered by the amended German Combined Heat and Power Act (KWKG) and benefit from the federal government&#8217;s flexibility bonus. Apart from maximizing their income, operators that switch to flex operation will be able to run their plants efficiently even after the EEG subsidy runs out. By switching to flexible plant operation, the location will be able to enter the control energy market. The modernized cogeneration plant in Heuchelhof is to start test operation before the end of 2018.<\/p>\r\n\r\n<h2>Further information: <\/h2>\r\n<ul>\r\n<li><a href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/gas-engine-tcg-2020\/\">MWM TCG 2020 Gas Engine<\/a><\/li>\r\n<li><a href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/\">MWM Gas Engines and Power Gensets<\/a><\/li>\r\n<li><a href=\"https:\/\/www.mwm.net\/en\/distributed-power-plants\/\">MWM Cogeneration Power Plant Solutions<\/a><\/li>\r\n<li><a href=\"https:\/\/www.mwm.net\/blockheizkraftwerke\/flexibilitaetspraemie-fuer-biogasanlagen\/\">Using the Flexibility Bonus (in German)<\/a><\/li>\r\n<\/ul>\r\n","protected":false},"excerpt":{"rendered":"<p>The cogeneration power plant in the Heuchelhof district of W\u00fcrzburg, Germany, has been in operation at Heizkraftwerk W\u00fcrzburg &#8211; a subsidiary of the W\u00fcrzburg municipal utility provider &#8211; for the past 23 years. The MWM TCG 2020 V12 gensets installed by the MWM partner ETW Energietechnik will increase the CHP plant&#8217;s efficiency considerably and enable the operator to enter the control energy market. By means of the engine replacement of the natural gas-fired plant, the location will become even more efficient, both economically and in terms of the energy output.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-63415","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market - MWM<\/title>\n<meta name=\"description\" content=\"The MWM TCG 2020 V12 gensets installed by the MWM partner ETW Energietechnik will increase the CHP plant&#039;s efficiency.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market\" \/>\n<meta property=\"og:description\" content=\"The MWM TCG 2020 V12 gensets installed by the MWM partner ETW Energietechnik will increase the CHP plant&#039;s efficiency.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/\" \/>\n<meta property=\"og:site_name\" content=\"MWM\" \/>\n<meta property=\"article:published_time\" content=\"2018-11-21T22:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-17T10:16:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mwm.net\/files\/upload\/image\/7363_2_MWM-TCG-2020-V12.jpg\" \/>\n<meta name=\"author\" content=\"uvidic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"uvidic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/\"},\"author\":{\"name\":\"uvidic\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#\\\/schema\\\/person\\\/a9ccdc3b62a7564a1435c6987af49a2d\"},\"headline\":\"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market\",\"datePublished\":\"2018-11-21T22:00:00+00:00\",\"dateModified\":\"2021-06-17T10:16:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/\"},\"wordCount\":384,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mwm.net\\\/files\\\/upload\\\/image\\\/7363_2_MWM-TCG-2020-V12.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/\",\"name\":\"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market - MWM\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mwm.net\\\/files\\\/upload\\\/image\\\/7363_2_MWM-TCG-2020-V12.jpg\",\"datePublished\":\"2018-11-21T22:00:00+00:00\",\"dateModified\":\"2021-06-17T10:16:37+00:00\",\"description\":\"The MWM TCG 2020 V12 gensets installed by the MWM partner ETW Energietechnik will increase the CHP plant's efficiency.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/files\\\/upload\\\/image\\\/7363_2_MWM-TCG-2020-V12.jpg\",\"contentUrl\":\"https:\\\/\\\/www.mwm.net\\\/files\\\/upload\\\/image\\\/7363_2_MWM-TCG-2020-V12.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/news\\\/news-releases\\\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/\",\"name\":\"MWM\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#organization\",\"name\":\"Caterpillar Energy Solutions GmbH\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mwm.net\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/logo2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.mwm.net\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/logo2.jpg\",\"width\":260,\"height\":142,\"caption\":\"Caterpillar Energy Solutions GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mwm.net\\\/en\\\/#\\\/schema\\\/person\\\/a9ccdc3b62a7564a1435c6987af49a2d\",\"name\":\"uvidic\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market - MWM","description":"The MWM TCG 2020 V12 gensets installed by the MWM partner ETW Energietechnik will increase the CHP plant's efficiency.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/","og_locale":"en_US","og_type":"article","og_title":"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market","og_description":"The MWM TCG 2020 V12 gensets installed by the MWM partner ETW Energietechnik will increase the CHP plant's efficiency.","og_url":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/","og_site_name":"MWM","article_published_time":"2018-11-21T22:00:00+00:00","article_modified_time":"2021-06-17T10:16:37+00:00","og_image":[{"url":"https:\/\/www.mwm.net\/files\/upload\/image\/7363_2_MWM-TCG-2020-V12.jpg","type":"","width":"","height":""}],"author":"uvidic","twitter_card":"summary_large_image","twitter_misc":{"Written by":"uvidic","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/#article","isPartOf":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/"},"author":{"name":"uvidic","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/person\/a9ccdc3b62a7564a1435c6987af49a2d"},"headline":"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market","datePublished":"2018-11-21T22:00:00+00:00","dateModified":"2021-06-17T10:16:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/"},"wordCount":384,"publisher":{"@id":"https:\/\/www.mwm.net\/en\/#organization"},"image":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mwm.net\/files\/upload\/image\/7363_2_MWM-TCG-2020-V12.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/","url":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/","name":"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market - MWM","isPartOf":{"@id":"https:\/\/www.mwm.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/#primaryimage"},"image":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mwm.net\/files\/upload\/image\/7363_2_MWM-TCG-2020-V12.jpg","datePublished":"2018-11-21T22:00:00+00:00","dateModified":"2021-06-17T10:16:37+00:00","description":"The MWM TCG 2020 V12 gensets installed by the MWM partner ETW Energietechnik will increase the CHP plant's efficiency.","breadcrumb":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/#primaryimage","url":"https:\/\/www.mwm.net\/files\/upload\/image\/7363_2_MWM-TCG-2020-V12.jpg","contentUrl":"https:\/\/www.mwm.net\/files\/upload\/image\/7363_2_MWM-TCG-2020-V12.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/modernization-of-heuchelhof-cogeneration-power-plant-etw-delivers-mwm-tcg-2020-gas-engines\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mwm.net\/en\/"},{"@type":"ListItem","position":2,"name":"Modernization of Heuchelhof Cogeneration Power Plant: ETW Energietechnik Supplies W\u00fcrzburg Municipal Utility Provider with Two MWM TCG 2020 Gas Engine Gensets for Entry to Control Energy Market"}]},{"@type":"WebSite","@id":"https:\/\/www.mwm.net\/en\/#website","url":"https:\/\/www.mwm.net\/en\/","name":"MWM","description":"","publisher":{"@id":"https:\/\/www.mwm.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mwm.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mwm.net\/en\/#organization","name":"Caterpillar Energy Solutions GmbH","url":"https:\/\/www.mwm.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","width":260,"height":142,"caption":"Caterpillar Energy Solutions GmbH"},"image":{"@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/person\/a9ccdc3b62a7564a1435c6987af49a2d","name":"uvidic"}]}},"_links":{"self":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/63415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/comments?post=63415"}],"version-history":[{"count":3,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/63415\/revisions"}],"predecessor-version":[{"id":89249,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/63415\/revisions\/89249"}],"wp:attachment":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/media?parent=63415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/categories?post=63415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/tags?post=63415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}