{"id":82234,"date":"2021-02-23T00:00:00","date_gmt":"2021-02-23T00:00:00","guid":{"rendered":"http:\/\/wordpress.home\/?page_id=82234"},"modified":"2025-02-20T17:20:02","modified_gmt":"2025-02-20T15:20:02","slug":"97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district","status":"publish","type":"post","link":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/","title":{"rendered":"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District"},"content":{"rendered":"<p>Mannheim, February 23, 2021<\/p>\n<p>BG Biogas Service GmbH operates a biogas plant in the Alb-Danube region in both Langenau and Seligweiler, each with a cogeneration power plant and a satellite cogeneration power plant. Until the engine replacement, all four <a title=\"Distributed Power Plants\" href=\"https:\/\/www.mwm.net\/en\/distributed-power-plants\/cogeneration-power-plant-solutions\/\">cogeneration power plants<\/a> had MWM TCG 2016 gas engines. After some 70,000 operating hours, the oldest cogeneration power plant in Langenau was modernized with an <a title=\"Gas engine TCG 3016\" href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/gas-engine-tcg-3016-v16\/\">MWM TCG 3016 V16 gas engine<\/a> in the fall of 2018. About a year later, the gas engine in Seligweiler was also replaced with a new MWM TCG 3016 V16 power genset. The plants are fueled with biogas that is gained exclusively from the digestion of energy plants such as corn and whole plant silage.<\/p>\n<p><img decoding=\"async\" title=\"Biogas plant and cogeneration power plant at the Langenau site\" src=\"https:\/\/www.mwm.net\/files\/upload\/image\/2146_2_Biogasanlage-BHKW-Langenau.jpg\" alt=\"Biogas plant and cogeneration power plant at the Langenau site\" \/><\/p>\n<div class=\"image-description\">\n<p style=\"text-align: left;\">Biogas plant and cogeneration power plant at the Langenau site (\u00a9 Manfred Herrmann). The German city of Langenau to the northeast of Ulm is famous for its many springs. In this water reserve, biogas facilities are required to meet high standards. For example, they are not permitted to use liquid manure.<\/p>\n<\/div>\n<h2>Higher Income, Lower Operating Costs Thanks to New MWM TCG 3016 Gas Engines<\/h2>\n<p>The biogas plants are based at two different locations in Langenau and Seligweiler in order to keep the transport routes of the plant material to the substrate facilities as short as possible. Both facilities are located in close proximity to the areas where the energy plants are grown and are each connected to agricultural businesses. In view of the good experience made with the predecessor model MWM TCG 2016, BG Biogas Service decided to replace the engine with another <a title=\"Gas Engines \/ Gensets\" href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/\">MWM gas engine<\/a> for the cogeneration power plant operation. &#8220;The high efficiency, reliability, and availability of the gas engine were key criteria that encouraged us to invest in a new MWM gas engine&#8221;, explains Hans Michael Keck, Managing Director of BG Biogas Service GmbH. Since the go-live, both gas engines have been running smoothly. Meanwhile, the TCG 3016 V16 gas engine in Langenau has completed some 16,500 operating hours, and the one in Seligweiler about 8,760 hours. &#8220;Thanks to the transition to the new MWM engine generation, we earn about \u20ac90,000 to \u20ac100,000 more every year&#8221;, says Keck.<\/p>\n<p><img decoding=\"async\" title=\"Hans Michael Keck, Managing Director of BG Biogas Service GmbH, in front of the newly installed gas engine\" src=\"https:\/\/www.mwm.net\/files\/upload\/image\/6959_2_Biogasanlage-Keck-MWM-Gasmotor-TCG-3016.jpg\" alt=\"Hans Michael Keck, Managing Director of BG Biogas Service GmbH, in front of the newly installed gas engine\" \/><\/p>\n<div class=\"image-description\">\n<p style=\"text-align: left;\">Hans Michael Keck, Managing Director of BG Biogas Service GmbH, in front of the newly installed gas engine (\u00a9 Manfred Herrmann)<\/p>\n<\/div>\n<h2>Distributed Energy Generation with Biogas Enables Low Downtimes of Less Than 3 Percent\/Year<\/h2>\n<p>In late October 2020, the satellite cogeneration power plant in \u00d6llingen was equipped with an MWM TCG 3016 V16 gas engine. The MWM TCG 3016 gas engine was installed by VG Diesel- und Gasmotoren-Service GmbH. The operators of the biogas plants depend on hassle-free operation of the engines, as the biogas-fueled cogeneration power plants do not have any fallback gensets. Thanks to the new engines, the <a title=\"Distributed Power Plants\" href=\"https:\/\/www.mwm.net\/en\/distributed-power-plants\/\">combined heat and power (CHP) plants<\/a> merely need to be shut down for inspections and oil change; thus, the downtimes of the cogeneration power plants of BG Biogas Service amount to less than 3 percent.<\/p>\n<p><img decoding=\"async\" title=\"The power gensets run very smoothly and reliably.\" src=\"https:\/\/www.mwm.net\/files\/upload\/image\/6990_2_Biogasanlage-MWM-Gasmotor-TCG-3016.jpg\" alt=\"The power gensets run very smoothly and reliably.\" \/><\/p>\n<div class=\"image-description\">\n<p style=\"text-align: left;\">The power gensets run very smoothly and reliably\u2014a precondition for hassle-free operation, as biogas cogeneration power plants usually do not have any fallback gensets. (\u00a9 Manfred Herrmann)<\/p>\n<\/div>\n<h2>Biogas Plants and Cogeneration Power Plants Turn Agricultural Operations into Power Producers<\/h2>\n<p>The biogas engines in Langenau supply the community with heat and power from cogeneration. The Langenau cogeneration plant has an electrical output of 800 kW and a thermal output of 791 kW. The total efficiency of the cogeneration power plant is 85.7 percent. This form of energy generation from biomass plays an important role in the development of sustainable energy supply. Currently, biogas offers the highest user benefit and the best use of the energy potential of biomass.<br \/>\nMWM offers biogas-optimized gas engines, complete plants, and containers for combined heat and power generation. These systems achieve maximum efficiency in various output segments. MWM also provides the system components required for gas processing and treatment. Where generators are installed in remote areas, the generated energy can even be used exclusively by the plant.<\/p>\n<h2>Reference Case CornTec Biogas Langenau and Seligweiler<\/h2>\n<div class=\"issue-image-section\">\n<div class=\"image-issuu\"><a href=\"https:\/\/issuu.com\/mwm_energy\/docs\/ces20016-referenzblatt_corntec_210x297_en_5_0_rz_s?fr=sM2FiYjY0MDY1NTY\" target=\"_blank\" rel=\"noopener\"><br \/>\n<img decoding=\"async\" title=\"Brochure on issuu.com\" src=\"\/files\/upload\/image\/0977_2_CES20016-Referenzblatt_CornTec_210x297_EN_4_001_sm-1_teaser.jpg\" alt=\"Brochure on issuu.com\" \/><br \/>\n<\/a><\/div>\n<div class=\"right-issuu\">\n<p>Click this brochure to access the digital publishing platform issuu.com. This website is governed by the <a href=\"https:\/\/issuu.com\/legal\/privacy\" target=\"_blank\" rel=\"noopener nofollow\">issuu Privacy Policy<\/a>.<\/p>\n<\/div>\n<\/div>\n<p>All languages on issuu: <a title=\"Reference Case on issuu (EN)\" href=\"https:\/\/issuu.com\/mwm_energy\/docs\/ces20016-referenzblatt_corntec_210x297_en_5_0_rz_s?fr=sM2FiYjY0MDY1NTY\" target=\"_blank\" rel=\"nofollow noopener\">EN<\/a> | <a title=\"Reference Case on issuu (DE)\" href=\"https:\/\/issuu.com\/mwm_energy\/docs\/ces21020-referenzblatt_andechser-mo_24f2ac2054f4cc?fr=sMDMwOTY0MDY1NTY\" target=\"_blank\" rel=\"nofollow noopener\">DE<\/a><br \/>\nDownload PDF: <a title=\"Download Reference Case PDF (EN)\" href=\"\/files\/upload\/mwm\/issuu\/CES20016-Referenzblatt_CornTec_210x297_EN_4_001_sm.pdf\" target=\"_blank\" rel=\"noopener\">EN<\/a> | <a title=\"Download Reference Case PDF (EN)\" href=\"\/files\/upload\/mwm\/issuu\/CES20016-Referenzblatt_CornTec_210x297_DE_2_002_sm.pdf\" target=\"_blank\" rel=\"noopener\">DE<\/a><\/p>\n<h2>Further information:<\/h2>\n<ul>\n<li><a title=\"Gas engine TCG 3016\" href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/gas-engine-tcg-3016\/\">MWM Gas Engine TCG 3016<\/a><\/li>\n<li><a title=\"Gas Engines \/ Gensets\" href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/\">MWM Gas Engines and Power Gensets<\/a><\/li>\n<li><a title=\"Distributed Power Plants\" href=\"https:\/\/www.mwm.net\/en\/distributed-power-plants\/cogeneration-power-plant-solutions\/\">MWM Cogeneration Power Plants<\/a><\/li>\n<li><a title=\"Agricultural Biogas\" href=\"https:\/\/www.mwm.net\/en\/gas-applications\/agricultural-biogas\/\">MWM Power Plant Solutions for Agricultural Biogas Plants<\/a><\/li>\n<li><a title=\"Biogas\" href=\"https:\/\/www.mwm.net\/en\/gas-expertise\/gas-solutions\/biogas\/\">Highest Efficiency with MWM Biogas Applications<\/a><\/li>\n<li><a title=\"CornTec Biogas-Langenau GmbH &amp; Co. KG, CornTec Biogas-Seligweiler GmbH &amp; Co. KG\" href=\"https:\/\/www.mwm.net\/en\/gas-applications\/references\/corntec-biogas-langenau-gmbh-co-kg-corntec-biogas-seligweiler-gmbh-co-kg\/\">MWM Reference Case: CornTec Biogas-Langenau GmbH &amp; Co. KG, CornTec Biogas-Seligweiler GmbH &amp; Co. KG<\/a><\/li>\n<li><a title=\"MWM CHP Biogas Station for Epirus Waste Processing Plant in Greece\" href=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/mwm-chp-biogas-station-for-epirus-waste-processing-plant-in-greece\/\">MWM press release: MWM CHP Biogas Station for Epirus Waste Processing Plant in Greece: Eco-Friendly Green Power from Neighborhood Waste Supplies National Power Grid<\/a><\/li>\n<li><a title=\"Sustainable Energy Cycle for Mallorca: MWM Gas Engines Produce Eco-Friendly Energy from Organic Waste\" href=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/sustainable-energy-cycle-for-mallorca-mwm-gas-engines-produce-eco-friendly-energy-from-organic-wast\/\">MWM press release: Sustainable Energy Cycle for Mallorca: MWM Gas Engines Produce Eco-Friendly Energy from Organic Waste<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The engines of the cogeneration power plants of BG Biogas Service GmbH, which are connected to biogas plants, have been replaced with MWM TCG 3016 gas engines. The plants in Langenau and Seligweiler supply the communities with heat and power.<\/p>\n","protected":false},"author":1,"featured_media":85063,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-82234","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District - MWM<\/title>\n<meta name=\"description\" content=\"The engines of the cogeneration power plants of BG Biogas Service GmbH have been replaced with MWM TCG 3016 gas engines.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District\" \/>\n<meta property=\"og:description\" content=\"The engines of the cogeneration power plants of BG Biogas Service GmbH have been replaced with MWM TCG 3016 gas engines.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/\" \/>\n<meta property=\"og:site_name\" content=\"MWM\" \/>\n<meta property=\"article:published_time\" content=\"2021-02-23T00:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-20T15:20:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"368\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"uvidic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"uvidic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/\"},\"author\":{\"name\":\"uvidic\",\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/person\/a9ccdc3b62a7564a1435c6987af49a2d\"},\"headline\":\"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District\",\"datePublished\":\"2021-02-23T00:00:00+00:00\",\"dateModified\":\"2025-02-20T15:20:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/\"},\"wordCount\":777,\"publisher\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/\",\"url\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/\",\"name\":\"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District - MWM\",\"isPartOf\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg\",\"datePublished\":\"2021-02-23T00:00:00+00:00\",\"dateModified\":\"2025-02-20T15:20:02+00:00\",\"description\":\"The engines of the cogeneration power plants of BG Biogas Service GmbH have been replaced with MWM TCG 3016 gas engines.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#primaryimage\",\"url\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg\",\"contentUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg\",\"width\":800,\"height\":368,\"caption\":\"Biogas plant and cogeneration power plant at the Langenau site\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.mwm.net\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.mwm.net\/en\/#website\",\"url\":\"https:\/\/www.mwm.net\/en\/\",\"name\":\"MWM\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.mwm.net\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.mwm.net\/en\/#organization\",\"name\":\"Caterpillar Energy Solutions GmbH\",\"url\":\"https:\/\/www.mwm.net\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg\",\"contentUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg\",\"width\":260,\"height\":142,\"caption\":\"Caterpillar Energy Solutions GmbH\"},\"image\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/person\/a9ccdc3b62a7564a1435c6987af49a2d\",\"name\":\"uvidic\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District - MWM","description":"The engines of the cogeneration power plants of BG Biogas Service GmbH have been replaced with MWM TCG 3016 gas engines.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/","og_locale":"en_US","og_type":"article","og_title":"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District","og_description":"The engines of the cogeneration power plants of BG Biogas Service GmbH have been replaced with MWM TCG 3016 gas engines.","og_url":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/","og_site_name":"MWM","article_published_time":"2021-02-23T00:00:00+00:00","article_modified_time":"2025-02-20T15:20:02+00:00","og_image":[{"width":800,"height":368,"url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg","type":"image\/jpeg"}],"author":"uvidic","twitter_card":"summary_large_image","twitter_misc":{"Written by":"uvidic","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#article","isPartOf":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/"},"author":{"name":"uvidic","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/person\/a9ccdc3b62a7564a1435c6987af49a2d"},"headline":"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District","datePublished":"2021-02-23T00:00:00+00:00","dateModified":"2025-02-20T15:20:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/"},"wordCount":777,"publisher":{"@id":"https:\/\/www.mwm.net\/en\/#organization"},"image":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/","url":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/","name":"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District - MWM","isPartOf":{"@id":"https:\/\/www.mwm.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#primaryimage"},"image":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg","datePublished":"2021-02-23T00:00:00+00:00","dateModified":"2025-02-20T15:20:02+00:00","description":"The engines of the cogeneration power plants of BG Biogas Service GmbH have been replaced with MWM TCG 3016 gas engines.","breadcrumb":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#primaryimage","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2021\/02\/Biogasanlage-BHKW-Langenau.jpg","width":800,"height":368,"caption":"Biogas plant and cogeneration power plant at the Langenau site"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mwm.net\/en\/"},{"@type":"ListItem","position":2,"name":"97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District"}]},{"@type":"WebSite","@id":"https:\/\/www.mwm.net\/en\/#website","url":"https:\/\/www.mwm.net\/en\/","name":"MWM","description":"","publisher":{"@id":"https:\/\/www.mwm.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mwm.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mwm.net\/en\/#organization","name":"Caterpillar Energy Solutions GmbH","url":"https:\/\/www.mwm.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","width":260,"height":142,"caption":"Caterpillar Energy Solutions GmbH"},"image":{"@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/person\/a9ccdc3b62a7564a1435c6987af49a2d","name":"uvidic"}]}},"_links":{"self":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/82234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/comments?post=82234"}],"version-history":[{"count":5,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/82234\/revisions"}],"predecessor-version":[{"id":108287,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/82234\/revisions\/108287"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/media\/85063"}],"wp:attachment":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/media?parent=82234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/categories?post=82234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/tags?post=82234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}