{"id":99116,"date":"2023-07-26T10:38:55","date_gmt":"2023-07-26T08:38:55","guid":{"rendered":"https:\/\/www.mwm.net\/?p=99116"},"modified":"2023-07-27T13:17:11","modified_gmt":"2023-07-27T11:17:11","slug":"recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power","status":"publish","type":"post","link":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/","title":{"rendered":"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power"},"content":{"rendered":"<p>Mannheim, July 26, 2023<\/p>\n<p>After 14 years of operation, an <a href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/gas-engine-tcg-2016\/\">MWM TCG 2016 gas engine<\/a> at a waste recycling plant in Kro\u015bniewice, Poland, successfully finished 100,000 hours of operation. The gas engine had been installed in 2008 by the Polish MWM distributor Centrum Elektroniki Stosowanej CES Sp. z o.o.<\/p>\n<h2>Optimum Plant Operation Thanks to MWM Gas Engine<\/h2>\n<p>For the past 14 years, the MWM TCG 2016 gas engine has been used for the operation of a recycling plant in Kro\u015bniewice. The engine is fueled with landfill biogas. The TCG 2016 engine recently reached the impressive mark of 100,000 operating hours. The engine is regularly maintained by the service team of Centrum Elektroniki Stosowanej CES Sp. z o.o. The durability and performance of the <a href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/gas-engine-tcg-2016\/\">MWM TCG 2016 V16 gas engine<\/a> enabled optimum operation of the recycling facilities for 14 years. Due to the low biogas production, the MWM engine is currently running with reduced output and continues to secure the smooth operation of the recycling facilities in Kro\u015bniewice.<\/p>\n<figure id=\"attachment_99172\" aria-describedby=\"caption-attachment-99172\" style=\"width: 800px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"wp-image-99172\" src=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_cor.jpg\" alt=\"After 14 years, the MWM TCG 2026 V16 gas engine of the recycling plant in Kro\u015bniewice finished 100,000 operating hours.\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_cor.jpg 830w, https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_cor-768x576.jpg 768w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><figcaption id=\"caption-attachment-99172\" class=\"wp-caption-text\">After 14 years, the MWM TCG 2016 V16 gas engine of the recycling plant in Kro\u015bniewice finished 100,000 operating hours.<\/figcaption><\/figure>\n<h2>Distributed MWM Energy Solutions for Landfills<\/h2>\n<p>MWM offers gas engines especially designed for operation with landfill gas. MWM gas engines can be run with various gas types, e.g. with natural gas, shale gas, mine gas, biogas, landfill gas, sewage gas, and syngas, reaching efficiency levels of more than 90 percent.<\/p>\n<h3>Further information:<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.mwm.net\/en\/gas-applications\/landfills\/\">MWM CHP Plants for Landfills<\/a><\/li>\n<li><a href=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/sustainable-waste-utilization-cogeneration-power-plant-with-three-mwm-tcg-3016-v12-gas-engines-supplies-plant-building-and-facilities-with-power-and-heat-from-landfill-gas\/\">MWM press release: Sustainable Waste Utilization: Cogeneration Power Plant with Three MWM TCG 3016 V12 Gas Engines Supplies Plant Building and Facilities with Power and Heat from Landfill Gas<\/a><\/li>\n<li><a href=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/energy-production-from-kitchen-waste-five-mwm-gas-engines-in-china-produce-sustainable-power-from-biogas\/\">MWM press release: Energy Production from Kitchen Waste: Five MWM Gas Engines in China Produce Sustainable Power from Biogas<\/a><\/li>\n<li><a href=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/97-percent-availability-biogas-fueled-mwm-tcg-3016-engines-supply-energy-to-alb-danube-district\/\">MWM press release: 97 Percent Availability: Biogas-Fueled MWM TCG 3016 Engines Supply Energy to Alb-Danube District<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>At a waste recycling plant in Poland, an MWM TCG 2016 V16 gas engine completed a total of 100,000 operating hours without any unexpected outages.<\/p>\n","protected":false},"author":14,"featured_media":99177,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[1242,994,725,742,866,1241],"class_list":["post-99116","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-centrum-elektroniki-stosowanej-ces-sp-z-o-o-en","tag-gas-engine","tag-landfill-gas","tag-mwm","tag-mwm-service-en","tag-tcg-2026-v16-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power - MWM<\/title>\n<meta name=\"description\" content=\"At a waste recycling plant in Poland, an MWM TCG 2016 V16 gas engine completed a total of 100,000 operating hours without any unexpected outages.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power\" \/>\n<meta property=\"og:description\" content=\"At a waste recycling plant in Poland, an MWM TCG 2016 V16 gas engine completed a total of 100,000 operating hours without any unexpected outages.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/\" \/>\n<meta property=\"og:site_name\" content=\"MWM\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-26T08:38:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-27T11:17:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_cor.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"830\" \/>\n\t<meta property=\"og:image:height\" content=\"622\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Armin Schmid\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Armin Schmid\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/\"},\"author\":{\"name\":\"Armin Schmid\",\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/person\/be93b80ce14071a07c57ea06ea45d26b\"},\"headline\":\"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power\",\"datePublished\":\"2023-07-26T08:38:55+00:00\",\"dateModified\":\"2023-07-27T11:17:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/\"},\"wordCount\":318,\"publisher\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_teaser-1.jpg\",\"keywords\":[\"Centrum Elektroniki Stosowanej CES Sp. z o.o.\",\"Gas Engine\",\"Landfill Gas\",\"MWM\",\"MWM Service\",\"TCG 2026 V16\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/\",\"url\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/\",\"name\":\"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power - MWM\",\"isPartOf\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_teaser-1.jpg\",\"datePublished\":\"2023-07-26T08:38:55+00:00\",\"dateModified\":\"2023-07-27T11:17:11+00:00\",\"description\":\"At a waste recycling plant in Poland, an MWM TCG 2016 V16 gas engine completed a total of 100,000 operating hours without any unexpected outages.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#primaryimage\",\"url\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_teaser-1.jpg\",\"contentUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_teaser-1.jpg\",\"width\":830,\"height\":416,\"caption\":\"CHP Unit in Krosniewice\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.mwm.net\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.mwm.net\/en\/#website\",\"url\":\"https:\/\/www.mwm.net\/en\/\",\"name\":\"MWM\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.mwm.net\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.mwm.net\/en\/#organization\",\"name\":\"Caterpillar Energy Solutions GmbH\",\"url\":\"https:\/\/www.mwm.net\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg\",\"contentUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg\",\"width\":260,\"height\":142,\"caption\":\"Caterpillar Energy Solutions GmbH\"},\"image\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/person\/be93b80ce14071a07c57ea06ea45d26b\",\"name\":\"Armin Schmid\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power - MWM","description":"At a waste recycling plant in Poland, an MWM TCG 2016 V16 gas engine completed a total of 100,000 operating hours without any unexpected outages.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/","og_locale":"en_US","og_type":"article","og_title":"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power","og_description":"At a waste recycling plant in Poland, an MWM TCG 2016 V16 gas engine completed a total of 100,000 operating hours without any unexpected outages.","og_url":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/","og_site_name":"MWM","article_published_time":"2023-07-26T08:38:55+00:00","article_modified_time":"2023-07-27T11:17:11+00:00","og_image":[{"width":830,"height":622,"url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_cor.jpg","type":"image\/jpeg"}],"author":"Armin Schmid","twitter_card":"summary_large_image","twitter_title":"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power","twitter_misc":{"Written by":"Armin Schmid","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#article","isPartOf":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/"},"author":{"name":"Armin Schmid","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/person\/be93b80ce14071a07c57ea06ea45d26b"},"headline":"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power","datePublished":"2023-07-26T08:38:55+00:00","dateModified":"2023-07-27T11:17:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/"},"wordCount":318,"publisher":{"@id":"https:\/\/www.mwm.net\/en\/#organization"},"image":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_teaser-1.jpg","keywords":["Centrum Elektroniki Stosowanej CES Sp. z o.o.","Gas Engine","Landfill Gas","MWM","MWM Service","TCG 2026 V16"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/","url":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/","name":"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power - MWM","isPartOf":{"@id":"https:\/\/www.mwm.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#primaryimage"},"image":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_teaser-1.jpg","datePublished":"2023-07-26T08:38:55+00:00","dateModified":"2023-07-27T11:17:11+00:00","description":"At a waste recycling plant in Poland, an MWM TCG 2016 V16 gas engine completed a total of 100,000 operating hours without any unexpected outages.","breadcrumb":{"@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#primaryimage","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_teaser-1.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/07\/Krosniewice-CHP-Unit_teaser-1.jpg","width":830,"height":416,"caption":"CHP Unit in Krosniewice"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mwm.net\/en\/news\/news-releases\/recycling-plant-in-poland-mwm-tcg-2016-v16-gas-engine-runs-100000-operating-hours-at-full-power\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mwm.net\/en\/"},{"@type":"ListItem","position":2,"name":"Recycling Plant in Poland: MWM TCG 2016 V16 Gas Engine Runs 100,000 Operating Hours at Full Power"}]},{"@type":"WebSite","@id":"https:\/\/www.mwm.net\/en\/#website","url":"https:\/\/www.mwm.net\/en\/","name":"MWM","description":"","publisher":{"@id":"https:\/\/www.mwm.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mwm.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mwm.net\/en\/#organization","name":"Caterpillar Energy Solutions GmbH","url":"https:\/\/www.mwm.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","width":260,"height":142,"caption":"Caterpillar Energy Solutions GmbH"},"image":{"@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/person\/be93b80ce14071a07c57ea06ea45d26b","name":"Armin Schmid"}]}},"_links":{"self":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/99116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/comments?post=99116"}],"version-history":[{"count":4,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/99116\/revisions"}],"predecessor-version":[{"id":99175,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/posts\/99116\/revisions\/99175"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/media\/99177"}],"wp:attachment":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/media?parent=99116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/categories?post=99116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/tags?post=99116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}