{"id":99780,"date":"2023-11-10T12:42:47","date_gmt":"2023-11-10T10:42:47","guid":{"rendered":"https:\/\/www.mwm.net\/?post_type=reference&#038;p=99780"},"modified":"2024-11-28T13:31:12","modified_gmt":"2024-11-28T11:31:12","slug":"rubanisko-ii-power-plant-lucenec-slovakia","status":"publish","type":"reference","link":"https:\/\/www.mwm.net\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/","title":{"rendered":"R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia"},"content":{"rendered":"<p><img decoding=\"async\" class=\"alignnone wp-image-99746\" src=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg\" alt=\"\" width=\"800\" height=\"425\" srcset=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg 1600w, https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container-768x408.jpg 768w, https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container-1536x815.jpg 1536w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><br \/>\nPhotograph: \u00a9 Veolia Energia Lu\u010denec, a.s.<\/p>\n<h2 class=\"fact-heading\">Facts &amp; Figures<\/h2>\n<table class=\"reference-data\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<colgroup>\n<col width=\"30%\" \/>\n<col width=\"70%\" \/> <\/colgroup>\n<tbody>\n<tr class=\"odd\">\n<td>Genset \/ gas engine:<\/td>\n<td>1 \u0445 <a href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/gas-engine-tcg-3016\/\">TCG 3016 V16<\/a><\/td>\n<\/tr>\n<tr class=\"even\">\n<td>Segment \/ gas type:<\/td>\n<td>Natural gas<\/td>\n<\/tr>\n<tr class=\"odd\">\n<td>Customer:<\/td>\n<td>Veolia Energia Lu\u010denec, a.s.<\/td>\n<\/tr>\n<tr class=\"even\">\n<td>Contractor:<\/td>\n<td>Engul, s.r.o.<\/td>\n<\/tr>\n<tr class=\"odd\">\n<td>Total output:<\/td>\n<td>800 kW<sub>el<\/sub> \/ 861 kW<sub>th<\/sub><\/td>\n<\/tr>\n<tr class=\"even\">\n<td>Go-live:<\/td>\n<td>2021<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>In 2021, the R\u00fabanisko II power plant went live in Lu\u010denec, Slovakia, supplying heat and electricity to the local population. For this project, an MWM TCG 3016 V16 generator set with an electrical output of 800 kW and a thermal output of 861 kW was selected. The entire project design, construction, installation, and commissioning of the MWM generator set was carried out by the official MWM distributor Engul. The TCG 3016 V16 cogeneration unit is installed in a soundproof enclosure in a boiler room. The generated electricity is fed into the grid. For this purpose, Engul has also installed a transformer and a high-voltage switchboard. The heat produced is distributed through the central heating network in Lu\u010denec.<\/p>\n<p>As part of the project, a second TCG 3016 V16 unit is to be commissioned at the end of 2023.<\/p>\n<div class=\"pro_grphc\">\n<div class=\"cntct_rght\"><a href=\"\/mwm?page_id=1038\">Contact Sales <strong>Click here<\/strong><\/a>\n<\/div>\n<\/div>\n<h3>Further information:<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/\">MWM Gas Engines and Power Gensets<\/a><\/li>\n<li><a href=\"https:\/\/www.mwm.net\/en\/gas-engines-gensets\/gas-engine-tcg-3016-v16\/\">MWM TCG 3016 V16 Gas Engine<\/a><\/li>\n<li><a href=\"https:\/\/www.mwm.net\/es\/news\/news-releases\/motor-de-gas-tcg-3016\/\">New TCG 3016 in Action: First 10,000 MWh of Electrical Power for Lu\u010denec<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>In 2021, the R\u00fabanisko II power plant went live in Lu\u010denec, Slovakia, supplying heat and electricity to the local population. Since then, the TCG 3016 V16 has generated more than 10,000 MWh of power.<\/p>\n","protected":false},"featured_media":99747,"parent":0,"template":"","meta":{"_acf_changed":false},"application":[70],"gas_type":[87],"series":[129,131],"power_range__el_":[143],"country":[1274],"container":[146],"class_list":["post-99780","reference","type-reference","status-publish","has-post-thumbnail","hentry","application-industry","gas_type-natural-gas","series-tcg-3016-en","series-tcg-3016-v16-en","power_range__el_-up-to-1000-kw","country-slovakia","container-container-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia - MWM<\/title>\n<meta name=\"description\" content=\"In 2021, the R\u00fabanisko II power plant went live in Lu\u010denec, Slovakia, supplying heat and electricity to the local population. Since then, the TCG 3016 V16 has generated more than 10,000 MWh of power.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia\" \/>\n<meta property=\"og:description\" content=\"In 2021, the R\u00fabanisko II power plant went live in Lu\u010denec, Slovakia, supplying heat and electricity to the local population. Since then, the TCG 3016 V16 has generated more than 10,000 MWh of power.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/\" \/>\n<meta property=\"og:site_name\" content=\"MWM\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-28T11:31:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"849\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.mwm.net\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/\",\"url\":\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/\",\"name\":\"R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia - MWM\",\"isPartOf\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg\",\"datePublished\":\"2023-11-10T10:42:47+00:00\",\"dateModified\":\"2024-11-28T11:31:12+00:00\",\"description\":\"In 2021, the R\u00fabanisko II power plant went live in Lu\u010denec, Slovakia, supplying heat and electricity to the local population. Since then, the TCG 3016 V16 has generated more than 10,000 MWh of power.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#primaryimage\",\"url\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg\",\"contentUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg\",\"width\":1600,\"height\":849},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.mwm.net\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.mwm.net\/en\/#website\",\"url\":\"https:\/\/www.mwm.net\/en\/\",\"name\":\"MWM\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.mwm.net\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.mwm.net\/en\/#organization\",\"name\":\"Caterpillar Energy Solutions GmbH\",\"url\":\"https:\/\/www.mwm.net\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg\",\"contentUrl\":\"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg\",\"width\":260,\"height\":142,\"caption\":\"Caterpillar Energy Solutions GmbH\"},\"image\":{\"@id\":\"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia - MWM","description":"In 2021, the R\u00fabanisko II power plant went live in Lu\u010denec, Slovakia, supplying heat and electricity to the local population. Since then, the TCG 3016 V16 has generated more than 10,000 MWh of power.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/","og_locale":"en_US","og_type":"article","og_title":"R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia","og_description":"In 2021, the R\u00fabanisko II power plant went live in Lu\u010denec, Slovakia, supplying heat and electricity to the local population. Since then, the TCG 3016 V16 has generated more than 10,000 MWh of power.","og_url":"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/","og_site_name":"MWM","article_modified_time":"2024-11-28T11:31:12+00:00","og_image":[{"width":1600,"height":849,"url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.mwm.net\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/","url":"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/","name":"R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia - MWM","isPartOf":{"@id":"https:\/\/www.mwm.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#primaryimage"},"image":{"@id":"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg","datePublished":"2023-11-10T10:42:47+00:00","dateModified":"2024-11-28T11:31:12+00:00","description":"In 2021, the R\u00fabanisko II power plant went live in Lu\u010denec, Slovakia, supplying heat and electricity to the local population. Since then, the TCG 3016 V16 has generated more than 10,000 MWh of power.","breadcrumb":{"@id":"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#primaryimage","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2023\/09\/MWM-Container.jpg","width":1600,"height":849},{"@type":"BreadcrumbList","@id":"https:\/\/www.mwm.at\/en\/gas-applications\/references\/rubanisko-ii-power-plant-lucenec-slovakia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mwm.net\/en\/"},{"@type":"ListItem","position":2,"name":"R\u00fabanisko II Power Plant, Lu\u010denec, Slovakia"}]},{"@type":"WebSite","@id":"https:\/\/www.mwm.net\/en\/#website","url":"https:\/\/www.mwm.net\/en\/","name":"MWM","description":"","publisher":{"@id":"https:\/\/www.mwm.net\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mwm.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mwm.net\/en\/#organization","name":"Caterpillar Energy Solutions GmbH","url":"https:\/\/www.mwm.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","contentUrl":"https:\/\/www.mwm.net\/wp-content\/uploads\/2022\/02\/logo2.jpg","width":260,"height":142,"caption":"Caterpillar Energy Solutions GmbH"},"image":{"@id":"https:\/\/www.mwm.net\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/reference\/99780","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/types\/reference"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/media\/99747"}],"wp:attachment":[{"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/media?parent=99780"}],"wp:term":[{"taxonomy":"application","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/application?post=99780"},{"taxonomy":"gas_type","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/gas_type?post=99780"},{"taxonomy":"series","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/series?post=99780"},{"taxonomy":"power_range__el_","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/power_range__el_?post=99780"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/country?post=99780"},{"taxonomy":"container","embeddable":true,"href":"https:\/\/www.mwm.net\/en\/wp-json\/wp\/v2\/container?post=99780"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}