The MWM Solutions Providers design and plan power plant projects in certain regions and are specialized in the scheduled and ad-hoc maintenance of power plants with MWM gas gensets.
MWM has rolled out projects of all sizes around the globe, installing small biogas gensets as well as power plants with an output of more than 50 MWel.
In the context of a modernization project, the Central Landfill Emscherbruch (Zentraldeponie Emscherbruch; ZDE) in Gelsenkirchen in the Rhine-Ruhr metropolitan region has been equipped with three new MWM TCG 3016 V12 gas engines.
The landfill gas plant consists of 3 containerized TCG 2020 V16. Its current is fed into the local power grid.
The project at the GaoAnTun landfill started in 2007 with the installation of one TCG 2016 V12B unit with an output of 537 kWel.
The 50-acre landfill in Ämmässuo, Finland, uses the landfill gas resulting from the fermentation of waste in four TCG 2032 V16 units. This is the first landfill gas plant with engines of the TCG 2032 series.